Owner: St. Vincent's Health System

Location: Hoover, AL

Building Area: 47,710 SF

Over the course of 8 years, BPA engaged in the design, construction, and fit-out of St. Vincent’s One Nineteen Health & Wellness Campus. This included an Ambulatory Surgery Center, outpatient Sleep Lab, GI Lab, Tenant Spaces, and Urgent Care.

The initial construction of the shell and ground floor of the Ambulatory Surgery Center was completed in 2016 and included the public lobby and connector corridor to the Wellness Center. The ambulatory surgery center included four operating rooms and three GI procedure rooms, all required support spaces, and physician office space. The careful aesthetic connection from the existing building to the new, in form, lighting, color palette, and textural references, was critical to the overall design. Subsequent renovations through 2022 have focused on the second floor of the facility. Physician offices for specialists were completed in 2019 and 2021. An outpatient Sleep Lab was completed in 2021 with six hospitality-styled bedrooms. A new GI Lab relocated to the second floor was completed in 2022. The success of the ASC necessitated these renovations to allow for current and anticipated increases in patient volumes. In addition to its interior evolution, the campus now includes the Sister’s Garden, an outdoor gathering space and meditation garden that further fuses the connection between the Wellness Center and Clinical Services to address the entirety of patient well-being.